Skip to main content

Monitoring Visit Role-Based SOP

# Monitoring Visit
Last updated: 04/14/2026

Purpose

Purpose

This SOP defines role ownership and handoff for the Monitoring Visit lifecycle, from report drafting to sponsor approval.

Use this page for operational alignment between CRA/Monitor teams and sponsor-side reviewers/approvers.

Validated account set for this SOP:

  • site01_monitor, site02_monitor (Monitor/CRA)
  • site01_reviewer (Reviewer)
  • study_sponsor (Sponsor)
  • study_admin (Configuration owner)

Scope

  • Module: Monitoring Visit
  • Main statuses: Draft -> Completed -> Reviewed -> Finalized -> Approved
  • Main roles in this SOP:
    • CRA / Site Monitor
    • Monitor / Reviewer
    • Sponsor (Monitoring Sponsor or Sponsor-side approver)

Account Mapping by Role

SOP RoleAccount
CRA / Site Monitorsite01_monitor, site02_monitor
Reviewersite01_reviewer
Sponsor Approverstudy_sponsor
Study Configuration Ownerstudy_admin

Monitoring Visit reports list used for role-based workflow validation

Role Matrix by Status

StatusPrimary Role OwnerTypical ActionsExit CriteriaNext Status
DraftCRA / Site MonitorCreate report, complete CRF fields, add comments/issues/reviews, attach evidence, update activities noteContent is complete and internally checkedCompleted
CompletedMonitor / ReviewerPerform quality and clinical operations review, verify report completeness and consistencyReviewer confirms report quality for escalationReviewed
ReviewedMonitor / Reviewer (with sponsor-facing readiness check)Consolidate review outcomes and prepare final package for sponsor decisionReport is ready for sponsor approval packageFinalized
FinalizedSponsor-side approver (or authorized equivalent)Sponsor review, compliance check, approval decisionSponsor accepts finalized reportApproved
ApprovedSponsor + Study OperationsArchive/reference, downstream follow-up and issue closure governanceNo further state escalationEnd state

Permission Matrix (Operational)

This matrix is based on Monitoring Visit permission groups used in the application (monitoringVisit.*) and status-change flow in report detail.

CapabilityCRA / Site MonitorMonitor / ReviewerSponsor
View list/detailYesYesYes
Add reportYes (if role granted)Typically limitedYes (if role granted)
Edit report contentYesRole-dependentRole-dependent
Create commentYesYesYes
Create issueYesYesYes
Create review notesOptional by roleYesYes
Change statusYes (if monitoringVisit.status.change)Yes (if monitoringVisit.status.change)Yes (if monitoringVisit.status.change)
Set ReviewedRequires dedicated permission gatePrimary roleRole-dependent
Set FinalizedUsually reviewer/lead monitor gatePrimary roleRole-dependent
Set ApprovedUsually sponsor/approver gateRole-dependentPrimary role

Minimum permissions to validate this SOP end-to-end:

  • monitoringVisit.report.view
  • monitoringVisit.report.create
  • monitoringVisit.report.update
  • monitoringVisit.review.create
  • monitoringVisit.status.change
  • monitoringVisit.export

Step-by-Step SOP

Step 1 - Create and Maintain Draft (CRA / Site Monitor)

Recommended account: site01_monitor

  1. Open Monitoring Visit -> Reports.
  2. Click Add Report and select site + visit type.
  3. Complete report content in Report detail.
  4. Save draft progress continuously.
  5. Add section-level comments/issues where evidence is required.

Expected output: a complete Draft ready for quality review.

Step 2 - Mark Complete for Review (CRA / Site Monitor)

Recommended account: site01_monitor

  1. Verify all mandatory CRF content and supporting evidence are present.
  2. Confirm no unresolved critical inconsistencies remain.
  3. Move report from Draft to Completed according to your workflow controls.

Expected output: report enters reviewer queue.

Step 3 - Reviewer Assessment (Monitor / Reviewer)

Recommended account: site01_reviewer

  1. Open report in Completed status.
  2. Validate quality, consistency, and operational readiness.
  3. Click Set as Reviewed and provide status note.
  4. If not acceptable, use Reject to return report to Draft with note.

Expected output: report is either corrected (back to Draft) or promoted to Reviewed.

Step 4 - Finalization Handoff (Monitor / Reviewer)

Recommended account: site01_reviewer

  1. Confirm all review comments are resolved or documented.
  2. Click Set as Finalized with clear note.
  3. Notify sponsor-facing recipients if required by SOP.

Expected output: sponsor-ready package in Finalized.

Step 5 - Sponsor Decision (Sponsor)

Recommended account: study_sponsor

  1. Sponsor/approver opens Finalized report.
  2. Perform sponsor-side review and compliance checks.
  3. Click Set as Approved with approval note.
  4. If not acceptable, use Reject to return to Draft for correction cycle.

Expected output: Approved report as final state.

Email and Notification SOP

Notification rules are configured in:

  • Home -> Study -> Monitoring Visit -> Visit Configuration -> Edit

Recommended setup:

  1. Add operational recipients for Draft/Completed handling.
  2. Add sponsor-facing roles for Reviewed/Finalized/Approved transitions.
  3. Use Specific people only for exceptions and named stakeholders.
  4. Require meaningful status notes so notification emails carry useful context.

Audit and Governance Rules

  • Every status change must include a note.
  • Use Reject to enforce correction loop instead of undocumented side-channel changes.
  • Keep issue/comment/review records attached to relevant report section for traceability.
  • In view-only studies, operations are read/export only; use a writable study for active workflows.

Execution Checkpoints for Documentation Team

  1. Verify one report exists in each status (Draft, Completed, Reviewed, Finalized, Approved).
  2. Verify one rejected report cycle exists (Reviewed/Finalized -> Draft).
  3. Verify status note modal is completed at each transition.
  4. Verify export actions work for monitor-level account.